By browsing our site you agree to our use of cookies. You will only see this message once. Find out more

Manchester Solutions Low Carbon Scheme - Supply and FIt.

Prior information notice

Works

Directive 2004/18/EC

Section I: Contracting authority

I.1)Name, addresses and contact point(s)

Skills Solution Limited c/o Valueworks
Merchant Exachange, 17-19 Whitworth Street West
For the attention of: Rachael Power
M1 5WG Manchester
UNITED KINGDOM
Telephone: +44 1942826788
E-mail:
Fax: +44 1942237968

Internet address(es):

General address of the contracting authority: http://www.gmchamber.co.uk/

Address of the buyer profile: https://tenders.e-marketplaces.co.uk

Further information can be obtained from: The above mentioned contact point(s)

I.2)Type of the contracting authority
Regional or local authority
I.3)Main activity
General public services
Public order and safety
Environment
Economic and financial affairs
Health
Housing and community amenities
Social protection
Recreation, culture and religion
Education
Other: Chamber of Commerce
I.4)Contract award on behalf of other contracting authorities
The contracting authority is purchasing on behalf of other contracting authorities: yes

Section II.A: Object of the contract (Works)

II.1)Title attributed to the contract by the contracting authority:
Manchester Solutions Low Carbon Scheme - Supply and FIt.
II.2)Type of contract and location of works
Main site or location of works:
UK
II.3)Information on framework agreement
The notice involves the establishment of a framework agreement: yes
II.4)Short description of nature and scope of works
In December 2009 the Manchester City Region was designated the UK's first Low Carbon Economic Area for the Built Environment. This will be a five year programme of work which will:
Address carbon abatement on an unprecedented scale through the deployment of existing technologies and accelerated investment in science, technology and innovation to bring new products to the market;
Raise employment and productivity levels by investing in the provision of appropriate low carbon high and low level skills;
Increase investment in Manchester and the UK in low carbon industries and their supply chains.
The New Economy Manchester are currently in the process of designing the work programme, working with a range of public and private sector partners. At the end of this five year programme they hope to have:
Added 650 million pounds to the economy;
Supported 34 000 jobs, including 18 000 in the supply chain, and.
Saved six million tonnes of carbon.
Alongside this, Manchester Solutions wish to develop an e-Marketplace for low-carbon and sustainable products and services. This highly innovative collaborative procurement and technology solution will essentially provide the platform to deliver the above objectives. Manchester Solutions are already in the process of setting up a framework of Low Carbon Materials, and wish to set up another alongside this for the Supply and Fit. It is envisaged that Contractors will be required to source all materials from the Low Carbon Materials Framework.
The categories envisaged to be included in this tendering exercise are as follows:
General Building Commercial;
General Building Domestic;
General Joinery Commercial;
General Joinery Domestic;
Roofer Commercial;
Roofer Domestic;
Plumber Commercial;
Plumber Domestic;
Heating Engineers Commercial;
Heating Engineers Domestic;
Electrician Commercial;
Electrician Domestic;
Externals and Environmental Commercial;
Externals and Environmental Domestic; and.
Refrigeration and Air Conditioning Engineers Commercial.
The above trades compliment the list of materials already being sourced by Manchester Solutions. More information can be found at Annex B.
Skills Solutions Limited a company within Greater Manchester Chamber of Commerce will be acting as the Contracting Authority for this opportunity.
Please see www.gmchamber.co.uk for further details about Greater Manchester Chamber of Commerce.
Greater Manchester Chamber of Commerce is the largest Chamber of Commerce in the UK with over 5,200 members who have a combined turnover of over 46bn pounds. The Chamber provides first class business support to companies of all shapes and sizes through a range of membership services and networking opportunities, specifically tailored to meet the needs of the individual businesses.
Chamber members have asked for assistance in getting the most out of their supply chain, something that is more important than ever in the current economic climate. In order to assist members Greater Manchester Chamber of Commerce have developed Chamber Plus.
This service brings member significant cost savings on their business costs through best practice procurement processes and supply chain expertise.
Since the creation of Chamber Plus Greater Manchester Chamber of Commerce have delivered tangible savings for a number of members. The success to date has led Greater Manchester Chamber of Commerce to develop Chamber Plus e-Marketplace which began trading in March 2011; this is an electronic trading platform through which all members can purchase products and services at agreed rates.
The development of Chamber Plus e-Marketplace is the most significant standalone investment that Greater Manchester Chamber of Commerce has made and this demonstrates the organisations commitment to this project and the importance of achieving competitive deals for members.
The Manchester Solutions Low Carbon Scheme contract is expected to be awarded on the basis of a four year agreement. Bidders should note that the award of the contract will not constitute any guarantee of work.
To register your interest in the project please email us at .
Valueworks are Greater Manchester Chamber of Commerce chosen supply chain integrator and have been engaged to assist them in carrying out this procurement exercise.

Lots

This contract is divided into lots: yes
II.5)Common procurement vocabulary (CPV)

45300000, 09300000, 45000000, 45300000, 45400000, 51000000, 51100000, 51200000, 51500000, 09330000, 09331000, 09310000, 09320000, 09332000, 44621200, 44622000, 44621220, 42511100, 42511000, 31122100, 44111520, 44221000, 44221100, 44221200, 31523000, 31518200, 31527260, 45331231, 45331230, 38551000, 71314200, 31100000, 31110000, 42122000, 42162000, 42163000, 42161000, 24113200, 45332000, 45324000, 39715200, 43324000, 39717100, 39714100, 42520000, 39563530, 44115100, 42514310, 42912310, 43323000, 45232120, 39144000, 44410000, 44411000, 44411100, 44411800, 44411700, 44411200, 44163112, 45111240, 44111600, 44111000, 44111100, 44111200, 44111800, 44115800, 44112310, 44112500, 44111700, 45262321, 45261410, 44112200, 44113100, 44110000, 44113000, 45112700, 44163110, 45232452, 39113600, 39113300, 39121200, 34928200, 45340000, 34928400, 34928470, 34928450, 34928480, 39224340, 45420000, 45330000, 45331000, 45310000

II.6)Scheduled date for start of award procedures and duration of the contract
II.7)Information about Government Procurement Agreement (GPA)
The contract is covered by the Government Procurement Agreement (GPA): no
II.8)Additional information:

Information about lots

Title attributed to the contract by the contracting authority: Lot No: 1 Lot title: General Building - Commercial
1)Short description:
Installation of the following materials are envisaged to be included in this lot -.
Blocks.
Bricks.
Cement / Mortar.
Curtain Walling.
Damp Proof Membranes.
Floor Screeds.
Masonry Eaves.
Floor Tiles.
Carpet Tiles.
Sheet Flooring.
Underlay.
Tiles.
Plaster.
Paints.
Ceiling Tiles.
Kerbs.
Paving.
Decking.
Ground Reinforcement Mats/Mesh/Grids.
Recycled Aggregates.
Soft Landscaping.
Benches.
Picnic Tables.
Fencing.
Signage.
Bollards.
Bins.
Planters.
Sun Pipes.
Energy Monitoring, Metering and Controls.
Ventilation systems.
Air conditioning.
Ducting systems.
Filters.
Windows.
Doors.
Insulation.
Photo Voltaic.
Solar Thermal Heating Systems.
Heat Pumps and Exchangers.
Combined Heat and Power.
Rainwater Harvesting.
Grey Water Re-use Systems.
Irrigation.
Taps.
Showers.
Urinals.
Low Flush Toilets.
Low Volume Baths.
Water Saving Devices.
Flow Controllers / Restrictors.
Drainage.
Green Roofs.
Groundwater Abstraction.
Rainwater Filtration / Sustainable Drainage Systems /.
Filtration.
2)Common procurement vocabulary (CPV)

45300000

5)Additional information about lots:
It is likely that all successful bidders will be required to source the materials through the Manchester Solutions Low Carbon Framework.
Title attributed to the contract by the contracting authority: Lot No: 2 Lot title: General Building - Domestic
1)Short description:
Of the following materials are envisaged to be included in this lot -.
Blocks.
Bricks.
Cement / Mortar.
Damp Proof Membranes.
Floor Screeds.
Masonry Eaves.
Floor Tiles.
Sheet Flooring.
Underlay.
Tiles.
Plaster.
Paints.
Ceiling Tiles.
Kerbs.
Paving.
Decking.
Ground Reinforcement Mats/Mesh/Grids.
Recycled Aggregates.
Soft Landscaping.
Benches.
Picnic Tables.
Fencing.
Bollards.
Planters.
Sun Pipes.
Energy Monitoring, Metering and Controls.
Ventilation systems.
Windows.
Doors.
Insulation.
Photo Voltaic.
Solar Thermal Heating Systems.
Heat Pumps and Exchangers.
Combined Heat and Power.
Rainwater Harvesting.
Grey Water Re-use Systems.
Irrigation.
Taps.
Showers.
Low Flush Toilets.
Low Volume Baths.
Water Saving Devices.
Flow Controllers / Restrictors.
Drainage.
Green Roofs.
Groundwater Abstraction.
Rainwater Filtration / Sustainable Drainage Systems /.
Filtration.
2)Common procurement vocabulary (CPV)

45300000

5)Additional information about lots:
It is likely that all successful bidders will be required to source the materials through the Manchester Solutions Low Carbon Framework.
Title attributed to the contract by the contracting authority: Lot No: 3 Lot title: General Joinery - Commercial
1)Short description:
Installation of the following materials are envisaged to be included in this lot -.
Windows.
Doors.
2)Common procurement vocabulary (CPV)

45300000

5)Additional information about lots:
It is likely that all successful bidders will be required to source the materials through the Manchester Solutions Low Carbon Framework.
Title attributed to the contract by the contracting authority: Lot No: 4 Lot title: General Joinery - Domestic
1)Short description:
Installation of the following materials are envisaged to be included in this lot -.
Windows.
Doors.
2)Common procurement vocabulary (CPV)

45300000

5)Additional information about lots:
It is likely that all successful bidders will be required to source the materials through the Manchester Solutions Low Carbon Framework.
Title attributed to the contract by the contracting authority: Lot No: 5 Lot title: Roofer - Commercial
1)Short description:
Installation of the following materials are envisaged to be included in this lot -.
Roof Membranes.
Roof Tiles.
Sun Pipes.
Insulation.
Photo Voltaic.
Solar Thermal Heating Systems.
Heat Pumps and Exchangers.
Green Roofs.
2)Common procurement vocabulary (CPV)

45300000

5)Additional information about lots:
It is likely that all successful bidders will be required to source the materials through the Manchester Solutions Low Carbon Framework.
Title attributed to the contract by the contracting authority: Lot No: 6 Lot title: Roofer - Domestic
1)Short description:
Installation of the following materials are envisaged to be included in this lot -.
Roof Membranes.
Roof Tiles.
Sun Pipes.
Insulation.
Photo Voltaic.
Solar Thermal Heating Systems.
Heat Pumps and Exchangers.
Green Roofs.
2)Common procurement vocabulary (CPV)

45300000

5)Additional information about lots:
It is likely that all successful bidders will be required to source the materials through the Manchester Solutions Low Carbon Framework.
Title attributed to the contract by the contracting authority: Lot No: 7 Lot title: Plumber - Commercial
1)Short description:
Installation of the following materials are envisaged to be included in this lot -.
Heat Recovery from Condensate and Boiler.
Blowdown.
Chemical and Mechanical Water Treatment.
Heat Emitters.
Warm Air Heaters.
Combined Heat and Power.
Rainwater Harvesting.
Grey Water Re-use Systems.
Irrigation.
Taps.
Showers.
Urinals.
Low Flush Toilets.
Low Volume Baths.
Water Saving Devices.
Flow Controllers / Restrictors.
2)Common procurement vocabulary (CPV)

45300000

5)Additional information about lots:
It is likely that all successful bidders will be required to source the materials through the Manchester Solutions Low Carbon Framework.
Title attributed to the contract by the contracting authority: Lot No: 8 Lot title: Plumber - Domestic
1)Short description:
Installation of the following materials are envisaged to be included in this lot -.
Domestic Boilers.
Chemical and Mechanical Water Treatment.
Combined Heat and Power.
Rainwater Harvesting.
Grey Water Re-use Systems.
Irrigation.
Taps.
Showers.
Low Flush Toilets.
Low Volume Baths.
Water Saving Devices.
Flow Controllers / Restrictors.
2)Common procurement vocabulary (CPV)

45300000

5)Additional information about lots:
It is likely that all successful bidders will be required to source the materials through the Manchester Solutions Low Carbon Framework.
Title attributed to the contract by the contracting authority: Lot No: 9 Lot title: Heating Engineers - Commercial
1)Short description:
Installation of the following materials are envisaged to be included in this lot -.
Energy Monitoring, Metering and Controls.
Gas-fired Condensing Water Heaters.
Heat Recovery from Condensate and Boiler.
Blowdown.
Localised Rapid Steam Generators.
Optimising Controllers for Wet Heating Systems.
Retrofit Burner Control Systems.
Sequence Controls.
Steam Boilers.
Chemical and Mechanical Water Treatment.
Heat Emitters.
Warm Air Heaters.
Solar Thermal Heating Systems.
Heat Pumps and Exchangers.
Combined Heat and Power.
Biomass Boilers.
Biomass Fired Warm Air Heaters.
2)Common procurement vocabulary (CPV)

45300000

5)Additional information about lots:
It is likely that all successful bidders will be required to source the materials through the Manchester Solutions Low Carbon Framework.
Title attributed to the contract by the contracting authority: Lot No: 10 Lot title: Heating Engineers - Domestic
1)Short description:
Installation of the following materials are envisaged to be included in this lot -.
Energy Monitoring, Metering and Controls.
Gas-fired Condensing Water Heaters.
Domestic Boilers.
Chemical and Mechanical Water Treatment.
Solar Thermal Heating Systems.
Heat Pumps and Exchangers.
Combined Heat and Power.
Biomass Boilers.
Biomass Fired Warm Air Heaters.
2)Common procurement vocabulary (CPV)

45300000

5)Additional information about lots:
It is likely that all successful bidders will be required to source the materials through the Manchester Solutions Low Carbon Framework.
Title attributed to the contract by the contracting authority: Lot No: 11 Lot title: Electrician - Commercial
1)Short description:
Installation of the following materials are envisaged to be included in this lot -.
Down lights.
Emergency Lighting.
Entertainment Lighting.
Flood Lighting.
Low Bay Lighting.
High Bay Lighting.
Highway Sign Lighting.
Office Luminaries.
Outdoor Amenity Lighting.
Replacement Lights.
Signage Lighting.
Specialist Environment Lighting.
Track Lighting.
Street Lighting.
Sun Pipes.
Energy Monitoring, Metering and Controls.
Ventilation systems.
Air conditioning.
Photo Voltaic.
Combined Heat and Power.
2)Common procurement vocabulary (CPV)

45300000

5)Additional information about lots:
It is likely that all successful bidders will be required to source the materials through the Manchester Solutions Low Carbon Framework.
Title attributed to the contract by the contracting authority: Lot No: 12 Lot title: Electrician - Domestic
1)Short description:
Installation of the following materials are envisaged to be included in this lot -.
Down lights.
Emergency Lighting.
Replacement Lights.
Sun Pipes.
Energy Monitoring, Metering and Controls.
Ventilation systems.
Photo Voltaic.
Combined Heat and Power.
2)Common procurement vocabulary (CPV)

45300000

5)Additional information about lots:
It is likely that all successful bidders will be required to source the materials through the Manchester Solutions Low Carbon Framework.
Title attributed to the contract by the contracting authority: Lot No: 13 Lot title: Externals and Environmental - Commercial
1)Short description:
Installation of the following materials are envisaged to be included in this lot -.
Kerbs.
Paving.
Decking.
Ground Reinforcement Mats/Mesh/Grids.
Recycled Aggregates.
Soft Landscaping.
Benches.
Picnic Tables.
Fencing.
Bollards.
Bins.
Planters.
Rainwater Harvesting.
Grey Water Re-use Systems.
Irrigation.
Drainage.
Green Roofs.
Groundwater Abstraction.
Rainwater Filtration / Sustainable Drainage Systems /.
Filtration.
2)Common procurement vocabulary (CPV)

45300000

5)Additional information about lots:
It is likely that all successful bidders will be required to source the materials through the Manchester Solutions Low Carbon Framework.
Title attributed to the contract by the contracting authority: Lot No: 14 Lot title: Externals and Environmental - Domestic
1)Short description:
Installation of the following materials are envisaged to be included in this lot -.
Kerbs.
Paving.
Decking.
Ground Reinforcement Mats/Mesh/Grids.
Recycled Aggregates.
Soft Landscaping.
Benches.
Picnic Tables.
Fencing.
Bollards.
Planters.
Rainwater Harvesting.
Grey Water Re-use Systems.
Irrigation.
Drainage.
Green Roofs.
Groundwater Abstraction.
Rainwater Filtration / Sustainable Drainage Systems /.
Filtration.
2)Common procurement vocabulary (CPV)

45300000

5)Additional information about lots:
It is likely that all successful bidders will be required to source the materials through the Manchester Solutions Low Carbon Framework.
Title attributed to the contract by the contracting authority: Lot No: 15 Lot title: Refrigeration and Air Conditioning Engineers - Commercial
1)Short description:
Installation of the following materials are envisaged to be included in this lot -.
Packaged chillers.
Refrigerated display cabinets.
Air Cooled Condensing Units.
Ventilation systems.
Air conditioning.
Ducting systems.
Filters.
2)Common procurement vocabulary (CPV)

45300000

5)Additional information about lots:
It is likely that all successful bidders will be required to source the materials through the Manchester Solutions Low Carbon Framework.

Section III: Legal, economic, financial and technical information

III.1)Conditions relating to the contract
III.1.1)Main financing conditions and payment arrangements and/or reference to the relevant provisions governing them:
III.2)Conditions for participation
III.2.1)Information about reserved contracts

Section VI: Complementary information

VI.1)Information about European Union funds
The contract is related to a project and/or programme financed by European Union funds: no
VI.2)Additional information:
VI.3)Information on general regulatory framework
VI.4)Date of dispatch of this notice:
13.1.2012